How WOW projects work | WOW
Start a project
Product development

Tooling done once, done right.

Mold design, steel selection and T1 samples managed end to end — with the tool owned by your order, so repeats stay cheap.

Start your project
01 / In practice

What this looks like on our floor.

Precision mold steel prepared for an injection molding program
Precision mold steel prepared for an injection molding program. Photos are representative; actual samples follow your artwork.
02 / How we run tooling

Transparent at every stage.

Mold design review

You see cavity layout, gate location and ejection plan before cutting.

T1 samples

First shots measured and photographed, with a dimension report.

Corrections

Adjustments and T2 samples quoted before they happen.

03 / Ownership & reuse

The fee pays once.

  • Tooling is dedicated to your project and stays with your orders
  • Repeat orders skip the setup fee once the tool is confirmed reusable
  • Tools can be maintained, stored and re-certified between runs
04 / FAQ

Questions we hear about this.

How long does a simple mold take?

Typically 18-25 days including T1 samples; complex multi-cavity tools take longer.

What does tooling cost?

Simple single-cavity tools often start around $600-1,200; complex or multi-cavity tools are quoted after mold design review.

WhatsApp