Start a project
WOW Blog / Costs & logistics

Custom manufacturing costs: what belongs in your quote?

Separate unit price, tooling, samples, packing, inspection and delivery costs. Use a worked planning example without assuming universal factory prices.

Cost planning by quantity
Cost planning with tiered quantities — photos are representative.

The short answer

A useful custom manufacturing quote separates recurring unit costs from setup and project costs. Compare the same specification, quantity, inspection scope and delivery endpoint; a lower product price does not necessarily mean a lower complete order cost.

Separate recurring and project costs

Recurring costs may include the product, decoration, individual packaging and assembly. Project costs can include design, prototypes, dies, moulds, screens or inspection setup. Ask whether each charge is already included in another line so that the total does not count it twice. [1]

Record the quantity and specification revision beside the price. A cheaper quote using a lighter material, fewer colours or different packaging is a different proposal, not necessarily a saving on the same product.

A worked planning example

Assume 100 units at a user-supplied budget of USD 5 each, USD 70 setup, USD 30 sampling, USD 20 extra packaging and USD 80 freight. The entered project subtotal is USD 700, or USD 7 per ordered unit, before any excluded taxes, destination charges or selling expenses. This is an illustrative calculation; replace the inputs with your written quotation.

If only 90 units are saleable, the same USD 700 is approximately USD 7.78 per saleable unit. A resale plan must separately consider platform fees, local fulfilment, advertising, returns and unsold inventory.

What changes a quotation?

Geometry, material grade, decoration, quantity per variant, production route, inspection and packing can change the scope. Compare a simplified version with the desired version to see which requirements drive cost. Ask for comparable quantity scenarios rather than assuming a standard percentage discount. [1]

Do not remove tooling automatically on a reorder

Ask the supplier to confirm that the same identified tool is available, serviceable and suitable for the unchanged drawing. Storage, maintenance, modification or replacement can generate additional charges. The fact that a tool was paid for earlier does not answer all ownership and reuse questions.

Request a complete written quote

Include sample scope, approved specification, unit price, project charges, inspection, packing, delivery term with named place, exclusions and quotation validity. Use the WOW calculators with your confirmed selling and purchasing assumptions. For destination cost planning, continue to the more detailed landed-cost guide rather than treating the product subtotal as a door-to-door total.

Questions buyers ask

Are the example unit prices a current WOW offer?

No. The example explains arithmetic using stated planning inputs. Request a written quote for the current specification, quantity and delivery scope.

Can I remove the tooling charge from every reorder?

Only after the supplier confirms the identified tool remains available, usable and suitable. Ownership, maintenance and modification costs also need agreement.

Sources and references

Official guidance and primary references relevant to this article. Check the current product scope and destination requirements before making a purchasing decision.

  1. Protolabs: mould and tooling cost considerations
  2. DHL: weight and dimensions
  3. ICC: Incoterms rules

Plan your next step

Share the product, quantities, intended use and destination. WOW can help scope sourcing, samples and the production enquiry.

Explore the relevant service Start your project
WhatsApp